Close Menu
  • Home
  • Recent
  • News
  • Background
  • Military
  • Editors’ Choice
  • Contact
Facebook X (Twitter) Instagram YouTube LinkedIn
Facebook X (Twitter) Instagram YouTube LinkedIn
Flying InsightFlying Insight
  • Home
  • Recent
  • News
    • Aircraft
      • Business Jets
    • Airlines
      • Routes and Destinations
    • Airports
    • Cargo
    • Crew
    • Financial
    • History
    • Manufacturers
      • Airbus
      • Boeing
      • Embraer
    • Military
    • Safety
      • 737 MAX
      • Incidents
      • Security
    • Space
    • Sustainability & Innovation
    • Video
  • Background
  • Editors’ Choice
  • Video
  • Contact
Flying InsightFlying Insight
Home»Menu»Safety»737 MAX»EASA to operate 737 MAX test flights in September
737 MAX

EASA to operate 737 MAX test flights in September

EditorialBy EditorialAugust 27, 2020, 16:00 UTC • Update 18:15 UTC2 Mins Read
Facebook WhatsApp Twitter LinkedIn Email
Copyright © Boeing
Share
Facebook WhatsApp Twitter LinkedIn Email

EASA, the European Union Aviation Safety Agency, will conduct test flights with the troubled Boeing 737 MAX. The flights will take place in the Canadian city of Vancouver over the course of one week starting September 7th, the EASA announced on Thursday.

Based on the test flights, the EASA will assess whether the changes that have been made are sufficient for an approval. The test flights are therefore the first step towards the return of the aircraft type to the European skies.

One week after the start of the test flights, supervisors from the so-called Joint Operations Evaluation Board will assess the new training procedures for 737 MAX pilots at London Gatwick. In addition, the EASA will be conducting simulator tests at the same London airport from the 1st of September.

At the beginning of July, the American FAA, the Federal Aviation Administration, already completed the flight tests for the recertification of the aircraft in the United States. Based on those flights, the FAA is demanding several adjustments to be made to the Boeing 737 MAX.

The problems with the 737 MAX have already cost Boeing billions of dollars. The plane has been grounded since March last year after two fatal crashes caused by problems with the MCAS, the Maneuvering Characteristics Augmentation System.

Meanwhile, Boeing has resumed production of the aircraft at the 737 MAX factory in Renton near Seattle. As the year progresses, the aircraft manufacturer wants to increase the production of the aircraft. The goal is to have at least 31 737 MAX airliners rolling off the line every month by 2021.

Boeing 737 MAX EASA FAA
Share. Facebook WhatsApp Twitter LinkedIn Email Copy Link
Editorial
  • Website
  • Facebook
  • X (Twitter)
  • Instagram
  • LinkedIn

Articles written by the editors of Flying Insight.

Related Posts

How much does it cost to fuel an airplane?

February 14, 2026By Editorial

Turbulent times: jetBlue faces a lawsuit by passengers for their nightmare flight

February 11, 2026By Editorial

Strange reason for United Boeing 767 diversion

January 27, 2026By Editorial
Recent

How much does it cost to fuel an airplane?

February 14, 2026

Turbulent times: jetBlue faces a lawsuit by passengers for their nightmare flight

February 11, 2026

Strange reason for United Boeing 767 diversion

January 27, 2026
Popular

The transatlantic flights operated by Boeing 737s

December 3, 2025

How much does it cost to fuel an airplane?

February 14, 2026

Strange reason for United Boeing 767 diversion

January 27, 2026

Recent Posts

Newsletter

Blocksy: Socials
Facebook X (Twitter) Instagram YouTube LinkedIn RSS
© 2026 Flying Insight / UpFactory B.V. All rights reserved.

Type above and press Enter to search. Press Esc to cancel.